Shallow Geothermal Borefield Verification

50-year system.
Zero subsurface
verification.
Until now.

BoreLogger gives you documented proof of what was actually drilled.

SCROLL
<5%
Of geothermal bores are ever deviation-surveyed
3–12°
Typical unmonitored deviation — enough to shift a bottom-hole 25–70ft off target at 500ft depth
50 yr
System design life built on geometry no one has verified
How It Works

Three steps. One survey run.

STEP 01
0 ft 100 ft 200 ft 350 ft 470 ft
Deploy the Probe
Lower the BoreLogger inside the HDPE pipe
STEP 02
DEPTH 124 ft
INC 1.2°
AZI 045°
DEPTH 248 ft
INC 2.1°
AZI 048°
INC 3.8° WARN
AZI 315°
Log Every Foot
Retrieve the data when the run is complete.
STEP 03
VERIFICATION REPORT
BH-01PASS
BH-05WARN
BH-06PASS
BH-10FLAG
BH-11PASS
TOTAL19/24
Get Your Report
An automated verification report
Who It's For

Different stakes.
Same need for verified geometry.

For Engineers & Designers
Iterate thermal design on real geometry, not assumptions.
  • Confirm installed spacing and verticality match your model
  • Feed actual borefield geometry back into your thermal design — not initial theoretical values
  • Specify verification on dense or boundary-adjacent projects
For Project Owners
Know exactly what's underground — and whose property it's on.
  • Verify bores stayed within your property boundary
  • Subsurface as-built documentation for your long-term asset records
  • Verification report for commissioning and regulatory handover
For Drilling Contractors
Add borefield verification to your service offering.
  • New differentiated service line for geothermal projects
  • Assistant driller can easily deploy on a standard line
  • Deliver professional verification reports to engineering clients
Live Borefield Demo

See the data. Explore the field.

Drag to rotate  ·  scroll to zoom  ·  click a bore to inspect

3D VIEW — DRAG TO ROTATE · SCROLL TO ZOOM
Euclid TEN — 12-Bore Demonstration Field
BORE
DEPTH
MAX INC
DRIFT AZI
LAT. DEP.
STATUS
Euclid TEN demonstration data · 12-bore subset · 20ft bore spacing · 450–480ft depth
What You Get

The subsurface built is missing.

Every survey produces a structured verification report — built for engineers, owners, and regulators.

  • Executive SummaryBore count, avg and max deviation, footprint vs. design.
  • Per-Bore StatusEvery bore: depth, inclination, lateral departure, PASS / WARN / FLAG.
  • Trajectory PlotsPlan view showing actual bore path vs. designed position.
  • Open DataRaw survey data for import into your own analysis tools.
↓  Download Sample Report
BOREFIELD VERIFICATION REPORT
PROJECTEuclid Thermal Energy Network
LOCATIONNew Haven, CT
TOTAL BORES24
AVG INCLINATION2.3°
MAX DEVIATION5.8° — BH-10
PASSED19 PASS
WARNED4 WARN
FLAGGED1 FLAG
Early Access Program

We're working with a small number of engineers and drillers on early pilots. Join to get priority access

✓ You're on the list.

We'll be in touch about early access and pilot opportunities.